EasyManua.ls Logo

Orbis AirSTAR - Page 32

Orbis AirSTAR
69 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
14. Explanation of the 4 parameters as shown in image 14:
1. ST. Actual sample temperature
2. ST. Sample temperature from last measurement
3. BT. Actual bath temperature
4. BT. Bath temperature from last measurement
15. At the End Of The Test:
The CP or PP result will appear in both Status Screen and Report Screen (see
16. Interpreting the result)
The CPPP Head’s status is now “Idle”.
The Bath temperature will automatically rise to +65 ºC to warm up the
sample. As soon as the sample temperature has reached 10 ºC, the bath will
stabilize at its idle 25 ºC temperature again. (Optionally: set your own
default warm-up temperatures with service level login)
It is now time for cleaning (see Chapter 3.4).
Image 14