System Operations Manual
www.paceworldwide.com
Page 45 of 50
20. Reinstall the nozzle and vacuum pick.
21. Test the heater.
11. Adjustments and Alignments
1. Platform planarity. This procedure is only necessary if the vacuum pick does not pick up the
component.
a. Insert the large vacuum pick.
b. Insert a PCB into holder.
c. Advance the production process to the 'place' step. Do not pick up a component.
d. Lower the heater head to the PCB by clicking the green button during the place step.
When the vacuum pick contacts the PCB click the heater stop button.
e. Loosen the four large screws on the front of the platform.
TF1700 shown
TF2700 shown