70 Aquarea air-to-water heat pumps - Planning and installation manual - 02/2022
Product Description
4
Terminals Connection Function Condition Cable cross
section
CN205
5 to 6
Temperature
sensor for buffer tank
PAW-A2W-TSBU
For measuring the buffer tank temperature Maximum total cable length: 30 m 2 × min.
0.3 mm²
CN206
2 to 4
SG signal Smart Grid switch
Dry contact, Vcc-Bit1, Vcc-Bit2, Open / Closed
Must be connected to both contacts.
System setting needed.
Maximum total cable length: 50 m
3 × min.
0.3 mm²
CN207
1 to 2
Demand control signal 0–10 V DC signal. Must be connected to 0-10 V DC control.
System setting needed.
Maximum total cable length: 50 m
2 × min.
0.3 mm²
CN207
3 to 4
Solar temperature sen-
sor PAW-A2W-TSSO
For measuring the solar module temperature Maximum total cable length: 30 m 2 × min.
0.3 mm²
CN208
1 to 2
Pump for heating
circuit 1
230 V AC, <500 W Maximum total cable length: 50 m 2 × min.
1.5 mm²
CN208
3 to 4
Pump for heating
circuit 2
CN209
1 to 2
Swimming pool pump 230 V AC Maximum total cable length: 50 m 2 × min.
1.5 mm²
CN209
3 to 4
Solar system 230 V AC Maximum total cable length: 50 m 2 × min.
1.5 mm²
CN209
5 to 6
Error signal
CN210
1 to 2
External compressor
switch
Drycontact,Open=OutdoorunitON,
Closed=OutdoorunitOFF
System setting needed.
Maximum total cable length: 50 m
2 × min.
0.3 mm²
CN210
3 to 4
Heating/ Cooling
Switch
Drycontact,Open=Heating,Closed=Cooling System setting needed.
Maximum total cable length: 50 m
2 × min.
0.3 mm²
Connection conditions
The connection of the optional PCB allows temperature control for two heating circuits. Mixing
valves, circulation pumps and temperature sensors for heating circuits 1 and 2 are to be connected
to the corresponding terminals of the optional PCB. The temperatures in the two heating circuits
are controlled mutually independently by the remote controller.
Pumps for heating circuits 1 and 2:
The cables of the pumps for heating circuits 1 and 2 must each be 2 x min. 1.5 mm²
and conform to the code 60245 IEC 57 or higher.
Maximum total cable length: 50 m
Solar system:
The cable of the solar system must be 2 x min. 1.5 mm² and conform to the code
60245 IEC 57 or higher.
Maximum total cable length: 50 m
Swimming pool pump:
The cable of the swimming pool pump must be 2 x min. 1.5 mm² and conform to the
code 60245 IEC 57 or higher.
Maximum total cable length: 50 m