EasyManua.ls Logo

Panasonic CU-10ME1XPK - Page 105

Panasonic CU-10ME1XPK
643 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Test Operation PACD011001C2
84 Test Operation Urban Multi “MX1, ME1 Series” Using R-22
<Settings of switches on the PC board adaptor>
BMS interface adaptor for outdoor unit
<Changeover by cool/heat central remote controller>
<Switch settings on adaptor printed circuit board>
SS1 (“BOTH” is selected when demand
control is carried out at the same
time.)
SS2
DS1·2
BOTH C / H DE
C / H
(SL302)
OFF ON
OFF
(SL303)
SS1 (When demand control is used
together, set the switch to “BOTH”)
SS2
DS1·2 For individual control, do not use the same address twice.
BOTH C / H DE
Cool
(SL305)
OFF ON
ON
(SL306)

Table of Contents

Other manuals for Panasonic CU-10ME1XPK

Related product manuals