EasyManua.ls Logo

Panasonic GT12 - User Manual

Panasonic GT12
206 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
PROGRAMMABLE DISPLAY
GT series
User's Manual
WUME-GTH-02
2021.3
panasonic.net/id/pidsx/global
[Applicable Models ]
・GT01 / GT11 / GT21
GT02 / GT02L / GT05 / GT12 / GT32
・GT03-E / GT32-R / GT32-E

Table of Contents

Other manuals for Panasonic GT12

Questions and Answers

  • D
    Derrick RodriguezAug 8, 2025
    What to do if Panasonic GT12 screen is blank?
    • L
      Lori PetersonAug 9, 2025
      If your Panasonic Monitor screen is blank, there are a couple of potential causes. First, ensure that the power supply is connected to the unit according to the specifications. Second, if only lamp and message parts are configured to the base screen, verify that the address of the substitute reference device and the device values on the PLC side are correct.
  • S
    Susan FitzgeraldAug 15, 2025
    What to do if Panasonic GT12 Monitor displays [Screen No. Error]?
    • J
      Jennifer ParrishAug 15, 2025
      If your Panasonic Monitor displays '[Screen No. Error]', it could be due to several reasons. * The screen settings from the PLC, the GT’s switch part or the auto-paging indicate an unregistered screen number. If this is the case, create and register screen content or specify the correct screen number. * When bringing up the keyboard screen during data input, an unregistered keyboard screen number was specified. In this case, create and register keyboard screen or specify the correct keyboard number. * GT configuration data and keyboard screen data exist in the GT, but there is no base screen data. To solve this, transfer base screen data from GTWIN.
  • N
    Nina HuntAug 21, 2025
    What to do if Panasonic GT12 displays [Memory is Full]?
    • H
      Heather JohnsonAug 21, 2025
      If your Panasonic Monitor displays '[Memory is Full]', it means that the total capacity of transferred base screen data exceeds the 384 Kbyte capacity of the GT. To resolve this, delete part of the base screen data so that the capacity doesn’t exceed the total capacity. You can check data capacity by going to [View (V)]?[Memory Usage Conditions] on GTWIN menu bar. If the data capacity is not over the limit, invalid data could possibly be remaining in the GT; when transferring data, do so after deleting the screen.
  • A
    Amy MatthewsAug 27, 2025
    Why does an unspecified screen appear or there is trouble when switching screens on Panasonic GT12 Monitor?
    • K
      Kevin ValentineAug 27, 2025
      If an unspecified screen appears or you experience trouble when switching screens on your Panasonic Monitor, there are several potential reasons: 1. The screen specification in the PLC screen setting, the GT switch part or the auto-paging is wrong. To fix this, specify the correct screen number. 2. The startup screen is specified in the GT configuration settings (GTWIN). Check the start-up screen setting for the GT configuration settings in GTWIN. Delete unnecessary settings and re-transfer configuration data. 3. An erroneous device or value is specified in the first word of the basic communication area word device. Check the device content specified on the PLC side in the first word of the basic communication area. (Do not use the basic communication area with ladder programs.)
  • S
    Shane HamiltonSep 2, 2025
    What does it mean if my Panasonic GT12 Monitor screen displays [No Screen data]?
    • T
      Timothy WarrenSep 2, 2025
      If your Panasonic Monitor screen displays '[No Screen data]', it indicates that there is no base screen data in the GT. This appears even when GT configuration data exists. To resolve this, transfer base screen data.

Summary

Safety Precautions

WARNING

Critical warnings about potential death or serious injury from product mishandling.

Chapter 1 Features and Functions

Chapter 3 Installation and Wiring

3.1 Installation

Covers environmental conditions and procedures for installing the GT unit.

3.2 Wiring the Power Supply

Details how to correctly wire the power supply to the GT unit.

Chapter 4 Connecting with PLC

4.1 Connection with PLC

Explains the various methods for connecting the GT series to PLCs.

Chapter 5 Troubleshooting

Panasonic GT12 Specifications

General IconGeneral
Screen Size12.1 inches
Display TypeTFT LCD
Response Time25 ms
Operating Temperature0°C to 50°C
Storage Temperature-20°C to 60°C
Panel Life50, 000 hours
Resolution800 x 600 pixels
Viewing Angle160° horizontal, 140° vertical

Related product manuals