59
16. Seal the welding point with bitumen (after they cooled
down) and tie with cable tie.
After welding process mount the fan motor box and
make its connections with U-CONNECTOR as told in
Fan Motor replacement
section.
17. Re-connect all the connections and re-seal the housing
with putty. Tie the cables with cable tie and close the air-
flow cover. (as told in previous sections)