EasyManua.ls Logo

Panasonic TH-42PE50B - Common Interface Module Operations; Inserting and Removing CI Modules; Navigating CI Software Interface

Panasonic TH-42PE50B
165 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10.3. P.C.B. (Printed Circuit Board) exchange
10.3.1. Caution
1. To remove P.C.B. , wait 1 minute after power was off for discharge from electrolysis capacitors.
10.3.2. Quick adjustment after P.C.B. exchange
P.C.B. Name Test Point Voltage Volume Remarks
P Board Vsus TPVSUS (SS) 175V ± 1V R628 (P) *
Vda TPVDA (SS) 67V ± 1V R665 (P)
PFC C488 (+) (-) (P) 395V ± 0.5V R443 (P)
Vdat C577 (+) (-) (P) 67V ± 0.1V R665 (P) load current : 0.4A
Vsus TPVSUS (SS) 188V ± 1V R628 (P) load current : 2.0A
SC Board Vad TPVAD (SC) -90V ± 1V VR6477 (SC)
Vset TPVSET (SC) 232V ± 6V Fixed
Vscn TPVSCN (SC) Vad + 120 ± 3V Fixed
SS Board Ve TPVE (SS) 156V ± 1V VR6074 (SS) *
D, DG Board White blance, Pedestal and Sub brightness for NTSC, PAL, HD, PC and 625i signals
*See the Panel label.
10.4. Adjustment Volume Location
30
TH-42PA50E / TH-42PE50B / TH-37PA50E / TH-37PE50B

Table of Contents

Other manuals for Panasonic TH-42PE50B

Related product manuals