4 Operating the equipment
4.1 Overview of controls
Figure 8 Table 9
4.2 Starting the equipment
Connect the generator to electrical supply and switch it on at the wall socket. Turn the generator on ( I ) at the power switch (located
on the rear of the generator) and wait.
The generator will perform a system check during which time the water bottle indicators will illuminate white then yellow, the system
check LED will flash, and the software version number, generator serial number and the company banner will be displayed on the
LCD.
Upon completion, the generator will enter INITIALIZING mode while the purifier is heating. Once complete it will revert to the default
menu as shown in figure 10.
Note: Upon first use the generator may appear to stop building pressure while the separation chamber fills with water. Should this
happen, restart the generator. The internal pressure (“ACT” pressure) of the generator will build up to the required operating
pressure (“SET” pressure). Once the required pressure is reached, the outlet valve of the generator will be opened, as indicated by
“LOAD ” on the display shown in figure 9, and hydrogen will be supplied to the application instrument.
Figure 9
If the generator is being powered for the first time, it will take approximately 48 hours for the generator to reach
the purity specified.
During start-up the generator may revert to the last error mode it experienced. If this occurs press . When the error is cleared
the generator will continue with the startup procedure. If the error cannot be cleared by this method follow the fault finding procedure
in section 6 of this user guide.
1
2
3
Indicator Generator status
Flas hing green
Startup
Ini tial i za ti on
Sol i d green On-line
Flas hing red Non critica l errors
Red
Criti cal errors
(s ystem locked)
Amber
On-l ine,
servi ce required
Tri-col ored s ystem check indicator
Control key pad used for menu navigati on and
generator operation
16 x 2 l i ne menus dis pla y
SET 100 PSI LOAD X
ACT 90 PSI
SET 100 PSI LOAD
ACT 100 PSI