S3C Cellular Gateway
Installation Guide
SD-458 / 52019
1. COMPONENTS
  Ensure all components are available:
  A. Gateway
  B. Cell Antenna (Qty. 2) 
  C. Ethernet Cable
  D. 120VAC Power Supply
2. PRODUCT LABEL INFORMATION
  Note key information on the product label located on the 
gateway.
  Cell Carrier Nomenclature:
  LAT = AT&T
  LVW = Verizon
S3C GATEWAY (LAT)  S/N: XXXXXXX
STORE: XXXX  XXXXXXXXX
24/7 SUPPORT: 1-888-920-6284
PROPERTY OF: PARKER HANNIFIN
  206 LANGE DRIVE
  WASHINGTON, MO
Cell Carrier Gateway S/N
A B C D
3. PLACEMENT
  Find a dry location outside of the refrigerated display case 
near the beginning or end of the S3C Ethernet network. 
By placing the gateway at the beginning or end of the net-
work, it will allow the gateway to be plugged into the open 
Ethernet port of the S3C Case Control. Alternatively, if it 
is challenging to reach the end of the network, a CAT-5 
Ethernet splitter can be used to accommodate a connection 
in the middle of the network.
4. POWER SUPPLY
  Install power supply cable to the back of the gateway.
CAT-5 
Ethernet 
Splitter