D - SE'I-rlNG UP BOILER - UNASSEMBLED UNITS
I-- ASSEMBLEDBLOCKS
1--The boilersectionsandbase,Models61-03thru61-07arefactoryassembled.Removeshippingskidfromtheboilerbase.If boilerisa 61-08,
or62-09thru62-15beginassemblyasnotedin PartII "SplitBlockAssembly".
2--Providea goodlevelfoundation,The Boilershouldbe locatedasneartothechimneyandcentralizedwithrespecttotheheatingsystemas
possible.
3--Open controlbox.Removecontroland manifoldassembly,Referto Figure6 andattachmanifoldto boilerwithfourV4-20x 1"machinescrews
and nutsprovided.Figures43thru45showthestandardcontrolassembliesusedon Models61-08thru62-15.
4 Openfluecollectorcarton.Removefluecollectorand Hi Tempropeandlay ropeontop ofboileragainstbead provided.SeeFigure7.
5--Place fluecollectoron topof ropeand attachto boilerwithtwo1/4"-20studs,washersandhex nutsprovided,throughfluecollectorbrackets
intothetapped lugs providedontopof theboilerend sections.Drawboltsdownsnugly.SeeFigure8,
6--Attach cast ironclean-outplate10clean-outopeningon leftsideofthe boiler.Thisplate, HiTempropeand mountinghardwaremaybefoundin
thecontrolboxreferred1opreviously.
7--Remove the burnersfromthecontrolboxand install.Installeachburnerby slippingtheopeninginthe venturioverthe orificespud.Insertthe
pinon thebottomof theburnerintothe holeprovidedin theflangeonthe basebackplate.SeeFigure9.TheBurnerswith pilotsattachedmust
be installedas follows:Note:Hookbolt isprovidedon models62-11through62-15.
ModelNo. No.Pilots
61-03 1
61-04 1
61-05 1
61-06 1
61-07 1
61-08 2
62-09 2
62-10 2
62-11 2
62-12 2
62-13 2
62-14 2
62-15 2
Location of Pilot
Between2nd and 3rd BurnerfromLeft
Between4th and5th BurnerfromLeft
Between4th and5th BurnerfromLeft
Between4th and 51hBurnerfromLeft
Between4th and 5thBurnerfromLeft
Between4th and5th Burnerfrom Leftand4th and5thfrom Right
Between4th and5th BurnerfromLeft and4th and5thfrom Right
Between4th and 5thBurnerfromLeft and4th and5thfrom Right
Between4th and5th Burnerfrom Leftand4th and 5thfrom Right
Between4th and 5thBurnerfromLeft and4th and 5thfrom Right
Between4th and 5thBurnerfromLeft and41hand5thfrom Right
Between41hand5th BurnerfromLeft and6th and7thfrom Right
Between6th and7th BurnerfromLeft and6th and7thfrom Right
8..-Removepilot tubingfromcontrolboxand installbetweengas valveandpilot.Referto figures43 through45.
9--If boileris to incorporatea tanklessheaterfordomestichot water,installinopeningprovidedin the rightsideofthe boiler.Sixmountingbolts
3/8"16 x3/4 are rovldedBesurerubber asketi I
( - ) p " • g "sbetweencoverplateandtheboier, Ifboiler doesnot incorporatea fanklessheater,a
blankcoverplateis providedwithrubbergasketand bolts.One3/4"pipeopeningis providedin the platefor the operatingand/orlimit control.
This 3/4"tappingis alsousedfor the pressuregaugeonthe steamboiler,
10--For suggestedpipingto fanklessheaterreferto Figure23.
DANGER:Installmixingvalveinhotwatersupplypiping.Watertemperatureover 125°Fcancausesevereburnsinstantlyor deathfromscalds,