EasyManua.ls Logo

Pelpro PPC90 - Vent Termination Clearances

Pelpro PPC90
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PelPro Cast Pellet Stove • 7093-600 • 07/13/16 pelprostoves.com8
Installing Your Stove
Vent Termination Clearances
Installing Your Stove
A
D
B
L
C
K
J
B
I
H
G
F
Clearan ces
A 12 Clearance above grade, veranda porch, deck or balcony (Including vegetation and mulch)
B
12 w i th ou tsi d e ai r ki t
4 8 n o ou tsi d e ai r ki t
Clearan ce b esi d e or b elow an y w i n d ow s or d oors th at open
12 * Clearan ce ab ove an y w i n d ow or d oor th at open s
C 18
Vertical clearance to ventilated soft located above the terminal within a horizontal distance of 2 feet from
th e cen ter li n e of th e termi n al
D 12 Clearan ce to an ou tsi d e corn er w all
F
12 w i th ou tsi d e ai r ki t
4 8 n o ou tsi d e ai r ki t
Clearan ce to a n on -mech an i cal ai r su pply i n let to th e b u i ld i n g or a comb u sti on ai r i n let to an y oth er
appli an ce
G 36” Clearan ce to a mech an i cal ai r su pply i n let
H 8 4 * * Clearan ce ab ove a paved si d ew alk or paved d ri vew ay located on pu b li c property
I 12 * * Clearan ce u n d er a veran d a, porch , d eck or b alcon y
J 12 Clearan ce ab ove th e roof
K 2 4 Clearan ce f rom an ad j acen t w all i n clu d i n g n ei g h b ori n g b u i ld i n g s
L
36” w i th i n a h ei g h t of 15
f eet ab ove th e meter /
reg u lator assemb ly
Clearan ce to each si d e of cen ter li n e ext en d ed ab ove n atu ral g as or propan e meter / reg u lator assemb ly
or mech an i cal ven t
Notice:
Do NOT terminate vent:
In any location that will allow ue gases or soot from
en teri n g or stai n i n g th e b u i ld i n g
I n an y locati on w h i ch cou ld create a n u i san ce or h aza rd
I n an y en closed or semi -en closed area su ch as a
carport, g arag e, atti c, craw l space, u n d er a su n d eck or
porch or n arrow w alkw ay
Closely f en ced area, or an y locati on th at can b u i ld u p
a con cen trati on of f u mes su ch as a stai rw ell, covered
b reeze w ay , etc.
Notice:
Do NOT terminate below an air inlet.
It is recommended that at least 60” (1.52m) of vertical
pi pe b e i n stalled w h en appli an ce i s ven ted d i rectly
th rou g h a w all—t h i s w i ll create a n atu ral d raf t, w h i ch
w i ll h elp preven t th e possi b i li ty of smoke or od or
ven ti n g i n to th e h ome d u ri n g a pow er ou tag e
I t w i ll also ke ep exh au st f rom cau si n g a n u i san ce
or h aza rd b y exp osi n g people or sh ru b s to h i g h
temperatu res
T h e saf est an d pref erred ven ti n g meth od i s to ext en d
th e ven t verti cally th rou g h th e roof or ab ove th e roof
*Recommended to prevent condensation on windows and thermal breakage. **This is a recommended distance. For additional requirements check local codes.

Other manuals for Pelpro PPC90

Related product manuals