6.3 Service Schedules
6.3.1 Prima SP2
The anaesthetic machine must be serviced to the following
service schedule:
6 months Inspection and Function Check
12 months Annual service which includes routine
replacement of seals, etc. as preventive
maintenance
2 and 4 years Additional tests and component replacement
Details of these service operations are given in the Service
Manual, available only to engineers trained by the
manufacturer.
6.3.2 Delta Vaporizer
Follow the instructions given in section 8 of the vaporizer
user instruction manual.
Servicing includes a periodic leak test and calibration test,
and a major overhaul at 10 years (5 years for Halothane
models).
On vaporizers with interlock, the system must be tested
during the vaporizer calibration test.
6.3.3 Monitoring Systems
Follow the service recommendations detailed in the monitor
user instruction manual.
6.3.4 AV-S Ventilator
If the anaesthetic machine was supplied with an AV- series
ventilator, refer to section 7 of the ventilator user instruction
manual, for servicing requirements.
These include:
6 months Inspection and Function Check
12 months Replace bellows
Replace O seals and drive gas inlet
filter, etc.
24 and 48 months Additional component replacement
6.3.5 A200 Absorber
6 months Inspection and Function Check
12 months Component replacement.
6.3.6 Anaesthetic Gas Scavenging System
Follow the service recommendations detailed in the AGSS
user instruction manual.
USER MAINTENANCE
33