TABLE OF CONTENTS
TABLE OF CONTENTS ..........................................................2
JOB SPECIFICATION SHEET ................................................2
California Proposition 65 Warning .......................................2
TIMER FEATURES ................................................................3
TIMER OPERATION ..............................................................4
MASTER PROGRAMMING MODE CHART ............................5
MASTER PROGRAMMING MODE .........................................6
MASTER PROGRAMMING MODE
continued ........................................ 7
MASTER PROGRAMMING MODE
continued ........................................ 8
USER PROGRAMMING MODE .............................................. 9
DIAGNOSTIC PROGRAMMING MODE ................................10
2510/2750/2850S TIMER ASSEMBLY ................................. 11
9000/9100/9500 TWIN TANK TIMER ASSEMBLY ...............12
3/4-INCH PLASTIC TURBINE METER ASSEMBLY .............13
PLASTIC PADDLE METER ASSEMBLY ...............................14
3/4-INCH BRASS PADDLE METER ASSEMBLY .................15
1-INCH BRASS PADDLE METER ASSEMBLY ....................16
1-INCH STAINLESS STEEL METER ASSEMBLY ................ 17
INLINE PLASTIC TURBINE METER ASSEMBLY ................18
1-1/2 INCH BRASS METER ASSEMBLY ............................ 19
1-1/2 INCH STAINLESS STEEL METER ASSEMBLY .......... 20
3/4-INCH, 1-INCH or 1-1/2 INCH PADDLE WHEEL METER
CAP ASSEMBLY ..................................................................21
TROUBLESHOOTING .......................................................... 22
2510SXT WIRING DIAGRAM ............................................... 23
2750SXT/2850SXT WIRING DIAGRAM ................................24
9000SXT/9100SXT/9500SXT WIRING DIAGRAM ................25
SERVICE ASSEMBLIES ......................................................26
JOB SPECIFICATION SHEET
Job Number: ______________________________________________
Model Number: ____________________________________________
Water Hardness: __________________________________ ppm or gpg
Capacity Per Unit: __________________________________________
Mineral Tank Size: ___________ Diameter: ________Height: ________
Salt Setting per Regeneration: ________________________________
1. Type of Timer:
A. 7 Day or 12 Day
B. Meter Initiated
2. Downflow: Upflow Upflow Variable
3. Meter Size:
A. 3/4-inch Turbine
B. 3/4-inch Paddlewheel
C. 1-inch Turbine
D. 1-inch Paddlewheel
E. 1-1/2 inch Turbine
F. 1-1/2 inch Paddlewheel
G. Generic ______Pulse Count _______ Model ____________
4. System Type:
A. System #4: 1 Tank, 1 Meter, Immediate, or
Delayed Regeneration
B. System #4: Time Clock
C. System #4: Twin Tank
5. Timer Program Settings:
A. Backwash: ______________________________ Minutes
B. Brine and Slow Rinse:_____________________ Minutes
C. Rapid Rinse: ____________________________ Minutes
D. Brine Tank Refill: ________________________ Minutes
E. Pause Time: ____________________________ Minutes
F. Second Backwash: _______________________ Minutes
6. Drain Line Flow Control: gpm
7. Brine Line Flow Controller: gpm
8. Injector Size#:
9. Piston Type:
A. Hard Water Bypass
B. No Hard Water Bypass
CALIFORNIA PROPOSITION 65 WARNING
This product contains chemicals known to
the State of California to cause cancer or
birth defects or other reproductive harm.
2 • FLECK SXT Timer Service Manual