Figure 1
Transport
All Hypro pumps are capable of being transported by air, sea, rail or motor vehicle. When the pump is shipped, ensure
that the pump is moved in accordance with local and national laws and is properly secured to prevent unwanted
movementwhichcouldcausedamagetopersonorproperty.Priortoshipping,alluidsshouldberemovedfromthe
pump.
Storage
New pumps in their boxes can be stored several years as long as the port plugs are not removed. Once the plugs
have been removed, if the pump is not to be used for an extended period of time (i.e. more than 30 days), the pump
must be winterized as described in the Cleaning section of this manual.
Assembly and Installation
Assembly
This pump comes completely assembled.
Installation
BeforeattemptingtoinstallyourHyprocentrifugalpump,itisimperativetoreadandunderstandthefollowing:
InstallationofaHypropumpshouldonlybeperformedbyatechnicianhavingtheknowledgeandskillsnecessary
toinstallthepumpwithouttheriskofpropertydamageorinjury.
When handling Hypro pumps, one should wear steel-toed shoes and protective gloves in order to protect the feet
in the event the pump is dropped and protect the hands from any sharp surfaces on the pump or chemicals.
Pumping systems must be installed in accordance with Hypro installation instructions. Failure to do so will void
yourwarrantyandcouldcausedamagetoproperty,seriouspersonalinjury,ordeath
Electricalpowercablesandpumphosesmustberoutedwherethereisnoriskofpersonneltripping,walkinginto,
or falling because they have been routed in areas where personnel are expected to move. Electrical power cables and
pump hoses should be routed according to local and national standards.
Itistheinstaller’sresponsibilitytoensurethatACelectric-drivemotors,Hypropumps,andmetalworkofsupport
structures are bonded to earth (ground), per local and national standards.
It is the installer’s responsibility to conduct earth continuity tests between AC electric-drive motors, Hypro pumps,
andmetalworkofsupportstructuresandearthaccordingtoEN60204-1:2006/A1:2009,oritssupersedingstandard,to
conrmthatallcomponentsthatneedtobeconnectedtoeartharesatisfactorilybonded.
Itistheinstaller’sresponsibilitytoconductelectricaltestsinaccordancewithEN60204-1:2006/A1:2009,orits
supersedingstandard,onnishedpumpassemblies.
All connections to electrical components must be number, symbol, or color-coded generally as recommended by
EN60204-1:2006/A1:2009,oritssupersedingstandard.