EasyManua.ls Logo

PGO BR-500 - Preface of Standard Operating Time Scale

PGO BR-500
330 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PREFACE OF STANDARD OPERATING TIME SCALE:
1.Qualified Staff: Has at least 3 years(included) experience in scooter repairing,
or get the equivalent scooter repairing licence.
2.Repairing Procedure: Use the proper tool and according to SERVICE MANUAL
procedure.
3.The tabled time includes checking, adjusting and confirming of the repairing.
The unit is "hour"
4.When repairing more than 2 parts, if they belong to same repairing system, then
the longest time will represent the whole repairing time.
5.When repairing more than 2 parts, if they belong to different repairing system,
then the summation of every time will represent the whole repairing time.
6.If the parts repaired are not in the table , please find the nearest one to represent
the repairing time.
Motive Power Industry CO., LTD
April,2007
PGO BR-500 ENGINE
P.12-2

Related product manuals