EasyManua.ls Logo

PGO BR-500 - Page 70

PGO BR-500
330 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- Install a new oil filter,
lubricate the sealing gasket,
and tighten further at the
prescribed torque.
Tightening torque:
Oil filter: 12 ~16 Nm
- Install the cylinder delivery
sleeve and connect the
recirculation sleeve to the
pump cover using 3 new
bands.
N.B.: Lock the bands
with the special pliers
being careful not to cut
deeply into the sleeve
and preventing
insufficient tightening.
- Install the pre-filter and the
engine oil drainage cap and
tighten at the prescribed
torque.
- Refill the engine with the
prescribed oil type.
Tightening torques:
Oil drainage cap: 24 ~30
Nm
Recommended oil:
Selenia HI Scooter 4
Tech 5W/40
PGO BR-500 ENGINE
P.10-51
Flywheel Cover

Related product manuals