Component Maintenance Manual
EFFECTIVITY: ALL
21-00-22
Page 6001
JULY 21, 2011
REPAIRS
TASK 21-00-22-30-801
8.0 R12 AIR CONDITIONING SYSTEM COMPONE
NT – REPAIR PROCEDURES
SUBTASK 21-00-22-99F-012
8.1 General:
8.1.1 Refer to Illust
rated Parts Listing (IPL) for figure/item numbers (Section 11).
WARNING
: SERVICE TECHNICIANS ARE ADVISED TO OBSERVE STANDARD SAFETY
PRECAUTIONS, SUCH AS WEARING PERSONAL SAFETY GEAR, TO PREVENT INJURY WHILE
PERFORMING SERVICE TO THE UNIT.
CAUTION
: SERVICE TECHNICIANS MUST PREVENT CONTAMINATION OF INTERNAL SYSTEM
PLUMBING DURING ANY SERVICING AND/OR MAINTENANCE OPERATION. THIS INCLUDES NOT
ALLOWING THE RECEIVER DRYER TO BE EXPOSED TO ATMOSPHERIC CONDITIONS FOR ANY
LENGTH OF TIME. ALL PLUMBING LINES SHOULD REMAIN CAPPED WHENEVER POSSIBLE DURING
THE SERVICING OF THE SYSTEM.
CAUTION
: RECEIVER DRYER MUST BE REPLACED ANY TIME THE VCS PLUMBING IS OPENED FOR
MAINTENANCE. REFER TO DISASSEMBLY (SECTION 5) AND ASSEMBLY (SECTION 9).
SUBTASK 21-00-22-30-001
8.2 Compressor Condenser Module Repair Procedures:
8.2.1 The followi
ng components may require periodic repair and/or replacement (refer to the
Inspection Schedule in Section 7 for mandatory time intervals) (refer to Figure 10001):
Drive Belt/Cover/Pulley
Drive Motor/Brushes
Compressor Assembly
Compressor Shaft Seal
Electrical Wiring
Receiver Dryer
Fan / Outlet Shroud
Condenser Coil
Hour Meter