EasyManua.ls Logo

Pinnacle microguard - Page 5

Pinnacle microguard
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fill this Information out Immediately
(It will be needed in the event you need assistance)
Purchase Date: _______________________________
Purchased From: ______________________________
Model No.: ___________________________________
Serial No.: ___________________________________
Options: _____________________________________
Microprocessor Revision No.: ____________________
The entire machine safety
system must be tested at the start of every shift.
Machine testing should include: (1) proper machine
operation and stopping capability; and (2) verication
of proper installation and settings of all point of
operation guards and devices before the operation is
released for production.

Table of Contents