EasyManua.ls Logo

Pioneer Eclipse PE300BU - Machine Preparation; Unpacking the Machine

Pioneer Eclipse PE300BU
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Machine Preparation
Unpacking the Machine
1. Cut and remove green bands holding the box to the
pallet.
2. Remove staples attaching the box to the platform at
the edge of the box.
3. With two people, one at either end of the box, lift
box straight up and off the machine.
4. Remove loose accessories from the top of machine.
5. Cut and remove the bands across the top of
the machine and across the burnish head. Lower
the attached ramp.
6. If the machine has batteries then remove the
battery cover and plug the battery pack plug into
the machine, turn on the key, drive the machine
down the ramp off the pallet. If the machine does
not have batteries, pull the machine down the ramp
and off the pallet. See the "Connecting the
batteries" section of the manual.
Connecting the Batteries
1. Place the batteries in the machine oriented as shown
in diagram.
2. Connect the batteries as shown in the battery
connection diagram.
3. DANGER! Incorrect connection of batteries can
cause explosion and/or serious injury.
4. Double check battery connections.
5. Connect the battery pack plug to the machine.
Installing Steel Skirt
1. Lift the deck upward about 90 degrees by pulling up
on the front of the deck. At this point, the tilt latch
will hold the deck in the pad change position. (Ref.
Machine Operation - Installing/Changing Burnishing
Pad)
2. Remove steel skirt from bubble wrap packing and
on the outside of the skirt, loosen the 1/4” hex bolt
with jam.
3. Slide the skirt onto the burnish head aligning the
slots in the skirt with the tabs on the deck. Make
sure the 1/4" bolt is at the back of the shroud.
4. Tighten the 1/4" bolt until the skirt is snug around the
deck but also floats up and down freely.
5. Tighten jam nut and lower deck to burnish position.
(Ref. Machine Operation: Installing / Changing
Burnishing Pad)
8