EasyManua.ls Logo

Piusi Cube 70/33 - Check Valve and Filter Installation; Connecting Hose to Pump Filter; Electrical Connections

Default Icon
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CUBE
19
/124
19 /6 0
EN
This manual is the property of PIUSI S.p.A. Any reproduction, even partial, is forbidden.
. Electrical Connections
Installation of
the check valve
and filter
At the intake end of the hose, a check valve and a suction filter
must be aached and must remain immersed at the boom of the
tank. The check valve and the filter are provided as part of the
equipment with CUBE dispenser.
Do not use conical threaded
connectors that could cause damage
to the threaded connector on the
pump filter.
ATTENTION
Before connecting the tubing
to the pump filter it is a good
idea to fill the tubing with
diesel fuel to facilitate priming
the pump during the phase of
puing it into operation.
NOTE
Filter
inlet
Check valve keeps the tubing
constantly filled with diesel
fuel.
Screw the other end of
the hose to pump filter.
Electrical connections must be performed in a workmanlike manner by skilled personnel,
respecting the regulations in effect in the country of installation.
The maximum acceptable variations from the electrical parameters are:
¦ voltage +/- %
¦ frequency +/- %
Connecting the
hose to CUBE

Other manuals for Piusi Cube 70/33

Related product manuals