EasyManua.ls Logo

Plas-Ties XL2 - Tying Operation Procedure

Default Icon
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1) Support the product to be twist tied with both hands and insert into the left side of the tying
area when tying in the vertical position.
*Insert into the bottom of tying area when in the horizontal tying position.
2) Hold the product in place until the product is twist tied. Tying cycle is approximately
3 seconds.
3) The product may be removed from the tying area any time after the tying cycle is complete.
*Periodically, the ribbon length will need to be either lengthened or shortened.
Slightly turn the Tying Diameter Adjustment Dial to the left to decrease ribbon length
and to the right to increase ribbon length. (See Page 22)
*Always remove any ribbon pieces from the XL2 before tying.
SECTION III: Operation
Page 20
TYING OPERATION