EasyManua.ls Logo

Porter-Cable PCFP02040 - Initial Set-Up (Break-In Procedure); Before Each Start-Up

Porter-Cable PCFP02040
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13 - ENG
INITIAL SET-UP (BREAK-IN PROCEDURE)
Risk of property damage. Serious damage may result if the
followingbreak-ininstructionsarenotcloselyfollowed.
This procedure is required before the air compressor is put into service and when the
check valve or a complete compressor pump has been replaced.
1. Make sure the Auto/Off switch (D) is in the "Off" position.
2. Check oil level in pump. See Pump Oil-Checking paragraph in the Maintenance
section for instructions.
3.
Plug the power cord into the correct branch circuit receptacle.
(Refer to Voltage
and Circuit Protection paragraph in the Installation section of this manual.)
4. Open the drain valves (K) (counterclockwise) fully to permit air to escape and
prevent air pressure build up in the air tank during the break-in period.
5. Move the Auto/Off switch to "Auto" position. The compressor will start.
6. Run the compressor for 20 minutes. Make sure the drain valve is open and there
is minimal air pressure build-up in tank.
7. After 20 minutes, close the drain valves by turning clockwise. The air receiver will
fill to "cut-out" pressure and the motor will stop.
The compressor is now ready for use.
BEFORE EACH START-UP
1. Set the Auto/Off switch (D) to "Off".
2. Ensure air tank is drained, see To Drain Tank under Maintenance section for
instructions.
3. Ensurethedrainvalve(K)isclosed.
4. Ensure safety valve (F) is functioning properly, see To CheckSafetyValve under
Maintenance section for instructions.
5. Check pump oil level, see Pump Oil-Checking under Maintenance section for
instructions.
Risk of property damage. Do not operate without oil or with
inadequate oil. PORTER-CABLE is not responsible for compressor failure caused
by inadequate oil.
6.
Plug the power cord into the correct branch circuit receptacle.
(Refer to Voltage
and Circuit Protection paragraph in the Installation section of this manual.)
7. Turn the regulator knob (N) counterclockwise to set the outlet pressure to zero.
Push regulator knob in to lock in place.
8. Attach hose and accessories.
Riskofunsafeoperation.Firmlygraspairhoseinhandwhen
installingordisconnectingtopreventhosewhip.
Risk of unsafe operation. Do not use damaged or worn
accessories.
NOTE: The hose or accessory will require a quick connect plug if the air outlet is
equipped with a quick connect body (M).
9. Ensure all covers and labels are in place, legible (for labels) and securely mounted.
Do not use compressor until all items have been verified.
RiskofBursting.Toomuchairpressurecausesahazardous
riskofbursting.Checkthemanufacturer’smaximumpressureratingforair
toolsandaccessories.Theregulatoroutletpressuremustneverexceedthe
maximumpressurerating.

Related product manuals