EasyManua.ls Logo

Post Glover PULSERPLUS PRO - Equipment Overview

Post Glover PULSERPLUS PRO
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PULSERPLUS PRO™ HIGH RESISTANCE GROUNDING SYSTEM
INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
4750 Olympic Blvd. • Erlanger, KY 41018 • USA
Phone: 800-537-6144 / 859-283-0778 • Fax: 859-283-2978
www.postglover.com
Serving the Electrical Industry Since 1892
PGR Document #HG111-06© 2006 Post Glover Resistors, Inc.
PULSERPLUS PRO™ HIGH RESISTANCE GROUNDING SYSTEM
INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
4750 Olympic Blvd. • Erlanger, KY 41018 • USA
Phone: 800-537-6144 / 859-283-0778 • Fax: 859-283-2978
www.postglover.com
Serving the Electrical Industry Since 1892
© 2006 Post Glover Resistors, Inc. 3
Section 1 – Equipment Overview
Post Glover High Resistance Grounding Equipment coordinates the use of resistors and control devices, creating
a high-resistance ground for a power system. The grounding equipment has these features:
Overvoltage Reduction:
Reduces the transient over voltages that can occur during arcing-type faults.
Fault Detection:
Providesanindicationwhentherstgroundfaultoccurs.Anadjustabletimedelayisincludedtoeliminate
nuisance faults.
Fault Tracking:
Helps to locate the fault by producing a tracer signal of current pulses easily distinguishable from background
noise.
Operation Protection:
Enables the system to continue operation with a single line-to-ground fault present.
Harmonic Detection:
Provides an indication when third harmonics exceed a preset value. An adjustable time delay is included to
eliminate nuisance faults.
Arc Flash/Blast Reduction:
Eliminates hazardous energy during ground faults, which are present in 90% of all electrical faults.
This instruction booklet is intended as a general guidance tool for personnel installing Post Glover High
ResistanceGroundingSystems.However,eachunitisdesignedforaspecicapplication/installation.The
detailed drawings provided with each unit supersede the general information provided in this booklet.
NOTE: Any work performed on this unit should be done by qualied persons and must be done in compliance
with national, regional, local and site-specic safety procedures.