EasyManua.ls Logo

Potterton Paramount two - Notes for Installation Location; Clearances

Potterton Paramount two
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Before installation
18 POTTERTON COMMERCIAL
120-393 632.4 04.08 Fh
4.5 Notes for installation location
Attention! When first installing the PARAMOUNT two for heating
operation or in connection with a DHW storage, the following has
to be observed:
In order to prevent damage to the boiler due to water quality, par-
ticularly due to leakages in the tank, suitable precautionary
measures should be taken regarding installation.
Installation room
The installation room must be dry, the room temperature must
be between 0 and 40°C.
The installation location has to be selected, especially, with re-
spect to ducting of the flue. When installing the boiler, the speci-
fied clearances have to be maintained.
Sufficient space should exist in the front to carry out inspection
and maintenance work.
4.6 Clearances
When installing the PARAMOUNT two , the following clearances
must be considered:
FRONT - access for maintenance
SIDES - minimum 20 mm
TOP - access for flue connection

Table of Contents

Related product manuals