EasyManuals Logo

PowerMaster SG 2004 Installation Manual

Default Icon
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
31
3. Check that Dipswitch #2 is in the correct position for left or right hand
operation as determined by the location of the gate opener, when viewed
from inside the fenced area.
12
3
4
5
ON
OFF
12
3
4
5
ON
OFF
Place Dipswitch #2
In "ON" Position For Left
Hand Operation And
"OFF" Position For Right
Hand Operation.
Left Hand
Operation
Right Hand
Operation
COM
COM
COM
24V
AC
24V
AC
ALT
RDO
OPN
CRO
FRE
OPN
CLO
STO
COM
COM
COM
OPN
PHO
CLO
PHO
SHW
REV
OPN
EDG
CLO
EDG
MST
OPN
MST
CLO
COM
COM
COM
OPEN
PUSH
FREE
EXT
ALT
RADIO
OPN/
CLO
RADIO
OPEN
CLOSE
PUS H
STOP
PUSH
CLOSE
PHOTO
OPEN
PHOTO
LD18
LD10
LD11
LD12
LD15
LD14
LD16
LD17
LD13
OPEN
CLOSE
STOP
OPEN CLOSE
FORCE
ADJUSTMENT
AUTO
RECLOSE
TIMER
OFF MAX
MID
LIMIT
REV
LOOP
OPN
EDGE
CLO
EDGE
RH OPN
LH CLO
LIMIT
RH CLO
LH OPN
LIMIT
MOTOR
OPEN
MOTOR
CLOSE
SHADOW
LOOP
LD19
LD2
LD3
LD4
LD5
LD6
LD8
LD9
LD7
12345
POWER
LD1
P3
P4
TB1
TB2
U1
U2
U4
4. Turn on power, and re-engage operator with manual disconnect lever.
NOTE: Operator will not run if manual disconnect lever is in the disengaged
position.
WARNING: STAY CLEAR OF ALL MOVING PARTS AND
ELECTRICAL COMPONENTS OF THE OPERATOR WHILE TESTING!
NOTE: The first time the gate operator is run after the power is turned on; a 3
second warning will sound before the operator starts.
32
COM
COM
COM
24V
AC
24V
AC
ALT
RDO
OPN
CRO
FRE
OPN
CLO
STO
COM
COM
COM
OPN
PHO
CLO
PHO
SHW
REV
OPN
EDG
CLO
EDG
MST
OPN
MST
CLO
COM
COM
COM
OPE N
PUSH
FRE E
EXT
ALT
RADIO
OPN/
CLO
RADIO
OPE N
CLOSE
PUSH
STOP
PUSH
CLOSE
PHOTO
OPE N
PHOTO
LD1 8
LD1 0
LD1 1
LD1 2
LD1 5
LD1 4
LD1 6
LD1 7
LD1 3
OPEN
CLOSE
STOP
OPEN CLOSE
FORCE
ADJUSTMENT
AUTO
RECLOSE
TIMER
OFF MAX
MID
LIMIT
REV
LO OP
OPN
EDGE
CLO
EDGE
RH OPN
LH CL O
LI MIT
RH CLO
LH OP N
LI MIT
MOTOR
OPEN
MOTOR
CLOSE
SHADOW
LO OP
LD19
LD2
LD3
LD4
LD5
LD6
LD8
LD9
LD7
12345
POWER
LD1
P3
P4
TB 1 TB 2
U1
U2
U4
ALT
RADIO
OPN/
CLO
RADIO
OPEN
CLOSE
PUSH
STOP
PUSH
LD11
LD12
LD15
LD14
LD16
LD17
OPEN
CLOSE
STOP
OPEN
12345
ON
OFF
12345
ON
OFF
For Normally
Open Stop
Button
For Normally
Closed Stop
Button
5. Open the gate electrically using the THREE BUTTON control station mounted
on the control board.
BOARD MOUNTED CONTROL STATION
NOTE: If Dipswitch #3 is in the “ON” position
for use with a NORMALLY CLOSED “STOP”
BUTTON, then the board mounted “STOP”
button must be held depressed in order to
use the open and close buttons. Releasing
the stop button will then stop the operator.
6. If the gate travels in the correct direction and stops on the open limit switch,
proceed to step #11.
NOTE: Open and Close Limit Switches are Reversed for Slide Left to Open
Operation.
7. If the operator runs in the wrong direction proceed to step #9.
8. If the limit nut depresses the open limit switch but does not stop the gate,
press the stop button or turn off the power immediately, and consult factory.
(1-800-243-4476).
OPEN LIMIT SWITCH
For Slide Right To Open
Operation
CLOSE LIMIT SWITCH
for slide right to open
operation
Pressure Plate
Limit Shaft
Limit nut
Limit nut

Other manuals for PowerMaster SG 2004

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the PowerMaster SG 2004 and is the answer not in the manual?

PowerMaster SG 2004 Specifications

General IconGeneral
BrandPowerMaster
ModelSG 2004
CategoryGate Opener
LanguageEnglish

Related product manuals