EasyManua.ls Logo

ProMinent Sigma 2 S2Ca - Pump, Power Supply; Other Units

ProMinent Sigma 2 S2Ca
77 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.2.2 Pump, power supply
1. Install an emergency cut-off switch or include the pump in the emer‐
gency cut-off management of the system.
2. Install the pump cable.
–
Key electrical data can be found on the pump name‐
plate.
7.2.3 Other units
Install the other units according to their supplied documentation.
Other units
Installation
36

Table of Contents