EasyManua.ls Logo

Pylontech Force-H3

Pylontech Force-H3
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Lithium Phosphate Energy Storage System
Force-H3 Operation Manual
Information Version: V1.0
5PMPA08-00200

Table of Contents

Questions and Answers:

Pylontech Force-H3 Specifications

General IconGeneral
BrandPylontech
ModelForce-H3
CategoryStorage
LanguageEnglish

Summary

Safety

Safety Symbols Guide

Explains danger, warning, and caution symbols used in the manual for hazard identification.

Technical Abbreviations

Lists and defines abbreviations used throughout the document for technical clarity.

General Safety Precautions

Provides essential safety guidelines for operating the battery system safely.

Safety Before Battery Connection

Outlines critical safety measures to follow before connecting the battery.

Safety During Battery Usage

Details safety precautions required while using the battery system.

System Introduction

Force-H3 Product Introduction

Introduces the Force-H3 battery storage system and its key features and applications.

Force-H3 System Specifications

Presents detailed technical specifications including parameters for single and multi-string configurations.

Battery and Control Module Specs

Provides technical specifications for the battery modules and the control module.

Control Module Interface Details

Describes the display panel, buttons, and interface ports of the control module.

Force-H3 System Diagram

Illustrates the electrical schematic and components of the battery system.

Installation

Installation Tools and Safety Gear

Lists necessary tools and recommended safety equipment for installation.

Installation Environment Requirements

Specifies requirements for cleaning, temperature, grounding, and clearance.

Battery Handling and Placement

Guidelines for safely handling and positioning battery modules and bases.

Mounting and Bracket Installation

Details installation of metal and anti-toppling brackets for system stability.

Cables Connection and Wiring

Instructions for connecting power cables, grounding, and communication wiring.

Operation

System Power On Procedure

Step-by-step procedure for powering on single and multi-string battery systems.

System Power Off Procedure

Outlines the correct procedure for safely powering down the battery system.

System Debug

System Debug Preparations

Steps to prepare the system for debugging, including power-on procedures.

Debugging with Inverter

Guides on coordinating debug efforts with the inverter and communication settings.

Maintenance

Trouble Shooting Guide

Provides solutions for common problems and error indicators in the system.

Component Replacement Procedures

Details procedures for replacing battery modules and control modules.

Periodic Battery Maintenance

Covers essential checks like voltage, SOC, cables, and system balancing.

Remarks

Battery Storage Recommendations

Provides recommendations for storing battery modules long-term to maintain performance.

Adding Battery Modules

Explains how to add new battery modules to an existing system.

Shipment

Battery Shipment Details

Details pre-shipment charging and compliance with transportation standards.

Related product manuals