Installation Manual
4. Power on and Run Router 40
www.qtech.ru
Figure 4-9 “Test properties” interface
Display the following test-HyperTerminal interface, press Enter at the blank
place, and the serial port displays the print information. The setting of the
HyperTerminal is complete.
Figure 4-10 test-Hyperterminal interface after setting
3.4.1. Power on and Start
Check before Power on
Check the router before powering on:
The interface cables, power cables, and PEs are connected correctly.
Power supply voltage meets the power requirement of the device. For details, refer to
Appendix C2 Requirements for Power Supply.