EasyManua.ls Logo

QUADRAX Q-LOCK - Installation of the Push Chanel and Rear Frame; Installation of the Chains Stabilizer Anchor Brackets

Default Icon
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Instal
Installation of the push chanel and rear frame
Step.6
Place the upper bracket (A) on the two tabs (B) of the articuled arm,
secure in place using two 8mm x 25mm bolts (C), 4 washers (D) et
nuts (E).
Note: Front snow blade not shown for clarity.
lation of the chains stabilizer anchor brackets
14
Step.5
Place push channel (A) over the end of the
mounting
tube (B)
and the rear frame channel (C).
Line up the holes as shown in the figure and secure
the push channel using four 10 x 110mm bolts (D),
eight washers (E) and four nuts
(F) then to the rear frame
channel using eight 10 x 30mm bolts (G), sixteen
washers (E) and
height nuts (F). Tighten firmly.
Note : You have multiple adjustment position on the tube and
channels. Position the bar in the distance taken in step 3 as shown.
The minimum and maximum length of the adjustment of the frame is from 85“ to 144”, if the frame is too short for your ATV/UTV you must add the
frame extension 165-12021 sold separately which will add 30” to to the length of the frame.
C
D
A
B
D
E
B
A
C
FE
E
D
GE
E
F
E
G
Distance from th e hook m ount to the front of th e ATV then add 7 inch es.
Lif t ing plat e h ole
ASSEMBLY