4.5. Technical specifications
Max. of verification interval (n)
Min. voltage per verification interval
Min. impedance of load cell
Max. impedance of load cell
Optional Equipment:
Rechargeable battery 6 x NiMH AA/R6
5. INDICATOR INSTALLATION
5.1. Unpacking and Installation
A. Take the indicator out of the packaging.
B. Connect the indicator and the platform and place the set on a flat and
even surface. Keep it far away from any sources of heat.
C. To level the weighing instrument turn its feet. Keep turning the feet until
the air bubble takes central position: