EasyManua.ls Logo

Raven AccuBoom - Point of Reference; Updates

Default Icon
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 2
6 RoGator (Liquid/AirMax 180) & TerraGator (Liquid/AirMax/AirSpread) AccuBoom™ Installation Manual
Ensure the machine’s hydraulic filters have been recently changed and there are no issues with the machine’s
hydraulic system (e.g., pump issues, faulty hydraulic motors, fine metal deposits in the hydraulic hoses, etc.).
Operate each of the machine’s boom hydraulic functions (i.e., tilt, fold, center rack, tongue extension, or other
hydraulic valve functions) three times to ensure the machines hydraulic valve is using fresh oil and debris is
flushed from the hydraulic hoses, valves, and filters.
Upon installation of the AccuBoom system, operate the boom and center rack raise/lower functions through
the machine’s manual control functions first before operating them via the AccuBoom controller/field
computer to ensure the hydraulic system has been installed correctly and air is released from the system.
Raven Industries recommends the following best practices when installing the AccuBoom system.
Use part numbers to identify the parts.
Do not remove the plastic wrap from a part until it is necessary for installation.
Do not remove plastic caps from a part until it is necessary for installation.
Tools Needed
The following tools are recommended for installation of the AccuBoom system:
SAE standard-sized wrenches
Cable ties
•Set of tools
POINT OF REFERENCE
The instructions in this manual assume that you are standing behind the machine, looking toward the cab.
UPDATES
Software and manual updates are available on the Raven Applied Technology website:
http://www.ravenhelp.com

Other manuals for Raven AccuBoom

Related product manuals