EasyManua.ls Logo

Reece Series S2 - Solenoid Starting Unit

Default Icon
125 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SOLENOID
STARTING
UNIT
1.
Pour
14
ounces
of
Reece
Solenoid
Oil
(contents
of
can)
Into
breather
opening.
2.
Connect
solenoid
plunger
link (A)
to
starting lever
(B) and position machine so the solenoid plunger is
vertical
when
the
starting
lever
is
up.
DOWN
POSITION
1.
When
the
machine
is
operated,
the
stop
bolt
holder
should
clear
the
side
of
the
bedplate
by
approximately
.005"
(thickness
of
this
page).
2.
To
check
this
clearance,
remove
cover
at
(F)
and
release
belt.
Then,
turn
power
on
hold
pushbutton
switch
on
top
of
relay
box
down
and
press
pedal
to
move
the
stop
bolt
holder
into
starting
position.
The
.005"
should
be
checked
at
point
indicated.
3.
To
adjust
the
clearance,
remove
lever
pin
(A),
and
screw
solenoid
plunger
link
up
or
down
as
desired.
UP
POSITION
1.
Depress
the
solenoid
plunger
to
its
down
position,
and
sighting
with
a
scale
against
the
top
edge
of
the
base,
check
1-1/8"
plunger
rise
to
the
top
position.
2. If
adjustment
is necessary, reposition
bumper
(D),
for
the
1-1/8"
rise.
This
movement
limits
the
stroke
of
the
solenoid
core
to
avoid
contact
with
the
top
of
its
housing.
NOTE:
The
1-1/8"
upward
movement
establishes
the
correct
position
for
starting
arm
(C).
3.
Attach
belt.
STOP
BOLT
HOLDER
APPROXIMATELY
.005"
CLEARANCE
AT
THIS
POINT
From the library of: Superior Sewing Machine & Supply LLC