2300 JETPORT DRIVE
ORLANDO, FLORIDA 32809
TEL (407) 851-4360
REGAL MARINE INDUSTRIES
ALL RIGHTS RESERVED
DRAWING TITLE:
CHECKED BY:
DR. BY:
APP. BY:
PAGE:
DR. BY:
CB BATTERY CABLE ROUTING
REV. #
DATE:
APP. BY:
ECB22C.dwg
DWG. NO.:
R SIFORD
04-11-08 1 OF 1
REV. DATE:
ENG STARTER POS
ROUTE TO ENG
STARTER
POS TERMINAL.
SEE NOTE 4.
BATTERY POS
MAIN DC
GROUND BUSS
NOTES:
1. BATTERY CABLES TO BE INSTALLED AS
SHOWN.
2. BATTERY CABLES TO BE SECURED EVERY
18" MAX.
3. INSTALL CHAFE PROTECTION AS NEEDED.
4. RED BATTERY INSULATOR BOOTS REQUIRED
AT BOTH STARTER POSITIVE AND BATTERY
POSITIVE CONNECTION POINTS.
TRIM PUMP
SUPPLIED W/ENG
ROUTE TO ENG
GROUND STUD
ROUTE TO BATTERY
POS & NEG TERMINALS.
SEE NOTE 4.