EasyManua.ls Logo

Riello RTQ 91 3S - Technical Assistance Service; Preparing for Initial Start-Up

Riello RTQ 91 3S
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
TECHNICAL ASSISTANCE SERVICE
It is essential to perform the following checks before star-
ting up or testing the functioning of your
RTQ 3S r
boiler. In particular, check that:
- The protective cardboard sheet (1) has been removed
from the ceramic fibre
-
The turbulators (2) are correctly positioned (vertical posi-
tion) inside the heat exchange tubes and the clips (3) are
resting against the wall (4) of the heat exchanger
- The water and gas cocks are open
- There is an adequate fuel supply
- The expansion vessel is properly charged
- The working pressure in the water circuit is over 1 bar
but below the maximum limit specified for the boiler
- The water circuits have been properly bled
- The mains power connections to the boiler and its
accessories (burner, pump, control panel, thermostats,
etc.) have been properly made.
b The phase-neutral polarity has been respected.
A ground (earth) connection is obligatory.
1
3
4
2
Preparing for initial start-up
PREPARING FOR INITIAL START-UP
TECHNICAL ASSISTANCE SERVICE

Related product manuals