EasyManuals Logo

Rinnai COMBI i120C User Manual

Rinnai COMBI i120C
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #3 background imageLoading...
Page #3 background image
Rinnai I-Series Boiler Conversion Manual 3
Introduction
1
This manual provides instrucons for converng gas
types on Rinnai I-Series Condensing Boilers.
For installaons in Canada, the conversion shall be
carried out in accordance with the requirements of the
provincial authories having jurisdicon and in
accordance with the requirements of the CGA-B149.1,
Natural Gas and Propane Installaon Code.
The boiler must be converted in accordance with local
codes or, in the absence of local codes, the Naonal Fuel
Gas Code, ANSI Z223.1/NFPA 54 and/or CSA B149.1,
Natural Gas and Propane Installaon Code.
To The Consumer
Keep this manual for future reference.
See the Safety Precauons secon in this
manual for detailed safety precauons.
Be sure the boiler conversion is performed by a
trained and qualied professional.
Indicates a potenally hazardous situaon which, if not avoided, could result in
minor or moderate injury. It may also be used to alert against unsafe pracces.
This is the safety alert symbol. This symbol alerts you to potenal hazards that can kill or hurt you and others.
Indicates an imminently hazardous situaon which, if not avoided, will result in
death or serious injury.
Indicates a potenally hazardous situaon which, if not avoided, could result in
death or serious injury.
DANGER
CAUTION
WARNING
To The Installer
A trained and qualied professional must
perform the gas conversion for this boiler.
Improper gas conversion will void the warranty.
The trained and qualied professional should
have skills such as:
Gas line sizing
Connecng gas lines, water lines, valves,
and electricity
Knowledge of applicable naonal, state, and
local codes
Training in installaon of condensing
boilers. Training on Rinnai I-Series
Condensing Boilers is accessible at
www.trainingevents.rinnai.us.
Read all instrucons in this manual before
aempng the gas conversion. The gas
conversion must be performed according to the
exact instrucons in this manual.
Proper gas conversion is the responsibility of
the installer.
When gas conversion is complete:
Complete the For the Consumerform in
the back of this manual.
Leave this manual with the boiler or give
the manual directly to the consumer.
Safety Symbols
2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rinnai COMBI i120C and is the answer not in the manual?

Rinnai COMBI i120C Specifications

General IconGeneral
BrandRinnai
ModelCOMBI i120C
CategoryBoiler
LanguageEnglish

Related product manuals