EasyManuals Logo

Rinnai COMBI i120C User Manual

Rinnai COMBI i120C
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
Rinnai I-Series Boiler Conversion Manual 9
6. Canadian High Altude Installaon Seng Procedure
All sengs/adjustments must be performed by a qualied Service Technician. The conversion shall be carried
out by a manufacturers authorized representave, in accordance with the requirements of the manufacturer,
provincial or territorial authories having jurisdicon and in accordance with the requirements of the
CAN/CGA-B149.1 or CAN/CGA-B149.2 Installaon Codes.
Canadian High Altude Installaons: Elevaons between 2,000  and 4,500  (600 m and 1,350 m) must
complete the High Altude Label. Place the completed High Altude Label on the controller supporng frame, to
the le side of the rang plate.
5. Conversion Rang Plate
2. Ax the conversion rang plate label on top of the exisng rate plate. DO NOT cover up the cercaon
logos on the exisng rang plate.
1. Enter the required informaon on the conversion rang plate label (shown below):
Place new rang plate label on
top of exisng rang plate.
DO NOT place label over
cercaon logos.
i150S

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rinnai COMBI i120C and is the answer not in the manual?

Rinnai COMBI i120C Specifications

General IconGeneral
BrandRinnai
ModelCOMBI i120C
CategoryBoiler
LanguageEnglish

Related product manuals