EasyManuals Logo

Rinnai COMBI i120C User Manual

Rinnai COMBI i120C
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
8 Rinnai I-Series Boiler Conversion Manual
SATISFACTORY
Front View
Blue Flame
Flame
Rod
UNSATISFACTORY
4. Check Operaon
Front View
Yellow Flame
Flame
Rod
Figure 4
3. Reinstall the boiler front panel using the four screws to secure it.
1. Check the normal operang sequence:
a. When you press the ON/OFF buon, the LED display will illuminate, the combuson fan will begin to run
if water is owing, and the spark will ignite the main burner.
b. This boiler has an automac ignion system. When the main burner has lit, the ame symbol for in
usewill glow red and the spark will stop.
2. Visual inspecon of ame:
a. Check that the burner ames are operang normally. The ame can be seen through the circular
window above the burner. When operang normally, the burner ame should burn evenly over the
enre surface. The ame should be clear, blue, and stable. A yellow ame is abnormal and maintenance
is required (Figure 4).

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rinnai COMBI i120C and is the answer not in the manual?

Rinnai COMBI i120C Specifications

General IconGeneral
BrandRinnai
ModelCOMBI i120C
CategoryBoiler
LanguageEnglish

Related product manuals