19
4. External termination of condensate drainage
pipe via condensate siphon
Installing the boiler
Please check that you are familiar with the
installation requirement before commencing
work.
The installation accessories described in
the following list are included in the boiler
package:
Boiler Box:
- Gas boiler
- Connection valves
Flue Box:
- coaxial 1m terminal ue
- 90°C coaxial elbow
Installation bag:
- Hanging plate
- Expansion screws (used to fix the hanging
plate)
Accessory bag:
- User’s manual, Installation manual and
warranty card
- Sealing cushion
- Paper template
Installation noise
Please comply with the relevant national or
region standard or guidelines when installing
the wall mounted gas boiler. The noise of
installation should be controlled within the
local standard requirement, pay special
attention to the any noise control time zones.
Appliance should be installed on a flat,
firm wall that can support the weight of the
boiler, also ensure the wall surface is not
combustible.