EasyManua.ls Logo

ROC COMBI HE 2802 - Opening the Box; Position the Boiler on the Wall; Installation of Pipework

ROC COMBI HE 2802
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
Opening the box
The appliance was packed in a hard box with
foam protection. Pay attention that the arrow
in the carton should be down when opening
the box. (Refer to below diagram)
Position the boiler on the wall
Fix the paper template to the wall to ensure the
correct position of the hanging bracket and the
ue hole.
Drill and plug the wall and secure the hanging
bracket using the screws provided ensure the
hanging bracket is level.
Remove all the protective packaging from the
gas boiler and place the boiler on the hanging
bracket.
Installation of pipework
Remove the caps and valves from the boiler.
Connect the valves to the boiler has shown
below and the valves to the heating system.
We would recommend that
a street elbow is used when
connecting the Cold water,
Domestic hot water, gas, central
heating inlet and outlet valves to
the external pipe work.

Other manuals for ROC COMBI HE 2802

Related product manuals