Maintenance
Preventive Maintenance
34 MagneMotion
Rockwell Automation Publication MMI-UM037A-EN-P - April 2020
Preventive Maintenance
The motors, node controllers, and power supplies in the MagneMover LITE transport system
are self-contained components that are designed for use in a clean, inert environment, and
require no maintenance other than that described here. Any deviation from this basic environ-
ment can affect the maintenance requirements, contact ICT Customer Support for additional
information. See Troubleshooting on page 53 if any problems are detected.
Table 5: MagneMover LITE Preventive Maintenance Schedule
Component Maintenance Action Frequency
*
Page #
MagneMover LITE
Transport System
Safe Shut-down As required 36
General Cleaning 3 months or
as required
37
Spray Cleaning 3 months or
as required
37
Glide Puck Cleaning 3 months or
as required
39
Wheeled Puck Cleaning 3 months or
as required
40
Wheeled Puck Wheel Inspection 3 months or
as required
41
Puck Wear Surface Maintenance 3 months or
as required
42
Cable Connection Inspection 3 months or
as required
42
Hardware Inspection 3 months or
as required
42
Cleaning Magnet Arrays 3 months or
as required
43
Air-cooled Motor Verify that the air supply is at or below
1.0 psig [6.9 kPa] pressure and the flow is
at or below 4.0 SCFM [113 L/min].
3 months or
as required
–
Verify that the air quality is per ANSI
7.0.01-1996, Quality Standard for Instru-
ment Air.
3 months or
as required
–
Node Controllers Transfer Log Files 3 months or
as required
43
Power Supplies Clean or Replace the Power Supply Air Fil-
ter
12 months or
as required
44