EasyManua.ls Logo

Rohde & Schwarz RTP044 - Unpacking and Checking the Instrument; 3 Preparing for Use

Rohde & Schwarz RTP044
75 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparing for Use
R&S
®
RTP
11Getting Started 1337.9946.02 ─ 05
3 Preparing for Use
This section describes the basic steps to be taken when setting up the R&S RTP
for the first time.
Observe the information on appropriate operating conditions provided in the data
sheet and the general information given in "Risk of instrument damage due to
inappropriate operating conditions" on page 6.
3.1 Unpacking and Checking the Instrument
To remove the instrument from its packaging and check the equipment for com-
pleteness, proceed as follows:
1. Pull off the polyethylene protection pads from the instrument's rear feet.
2. Carefully remove the pads from the instrument handles at the front.
3. Pull off the corrugated cardboard cover that protects the rear of the instru-
ment.
4. Carefully unthread the corrugated cardboard cover at the front that protects
the instrument handles and remove it.
5. Check the equipment for completeness using the delivery note and the acces-
sory lists for the various items.
6. Check the instrument for any damage. If there is damage, immediately contact
the carrier who delivered the instrument. Make sure not to discard the box and
packing material.
Packing material
Retain the original packing material. If the instrument needs to be transpor-
ted or shipped later, you can use the material to protect the control ele-
ments and connectors.
Unpacking and Checking the Instrument

Other manuals for Rohde & Schwarz RTP044

Related product manuals