Performing Measurements
R&S
®
ZNB/ZNBT
65Getting Started 1316.0062.02 ─ 26
5.1.1 Connecting the Instrument for Transmission Measurements
To prepare a transmission measurement, you have to connect your DUT (which for
simplicity we assume to have appropriate connectors) in-between a pair of analyzer
test ports. It is recommended that you preset the R&S ZNB/ZNBT to start from a well-
defined instrument state.
1. Connect the DUT between test ports 1 and 2 of the network analyzer as shown
above.
2. Switch on the instrument and start the VNA application.
Transmission S-Parameter Measurement