EasyManua.ls Logo

RS Feva - 3.2 Loading; 3.3 Safety Equipment

RS Feva
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.4 - Rigging the Jib
a)
b)
c)
To complete this section, you will need:
• 1 x Feva jib
• 2 x Feva shrouds
• 1 x shroud shackle
• 1 x jib halyard block
• 1 x jib halyard
• 1 x jib sheet
• 1 x jib halyard block tie
Before stepping the mast you will need to complete the following steps:
• Hook the eyelets at the end of the shrouds onto the shroud shackle.
Attach the shroud shackle to the lower of
the two metal rings on the front face of the
mast.
• Tie knot #1 in one end of the jib halyard block tie.

Other manuals for RS Feva

Related product manuals