J Line Pump
Horizontal Double Suction Centrifugal Pump – API 610 Process Pump
84 V1.032818
48. Insert the first axial bearing over the shaft from the non-coupling side until it reaches the
shoulder on the shaft.
Figure 8.46. Inserting the axial bearing over the shaft from the non-coupling side until it reaches the shoulder on
the shaft.
49. Insert a second axial bearing facing backwards over the shaft from the non-coupling side until
it reaches the first axial bearing.
Figure 8.47. Inserting a second axial bearing facing backwards over the shaft from the non-coupling side until it
reaches the first axial bearing.
The bearing must be heated to 100 °C / 212 °F. The bearing must be passed 3
times over the heater to demagnetize them. This should be done for the proper
installation and function of the bearing.