EasyManua.ls Logo

Ruijie Reyee RG-ES206GS-P Series - System Check

Ruijie Reyee RG-ES206GS-P Series
37 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RG-ES206GS-P Series Switches Hardware Installation and Reference Guide System Check
18
4 System Check
4.1 Checking the Device Startup
Check Before Device Power-On
Check that the switch is fully grounded.
The power cord is properly connected.
The power supply voltage meets the requirement of the switch.
Check After Program Startup (Recommended)
After the switch is powered on, you are advised to check the following items to ensure the normal configuration:
Indicators of the switch are in the normal state.
Service ports can forward data properly.

Related product manuals