Hardware Installation and Reference Guide Installing the AP
11
3 Installing the AP
The RG-RAP52-OD access point must be fixed outdoors.
Caution
Before installing the AP, make sure you have carefully read the requirements described in
Chapter 2 and the requirements are all met.
3.1 Installation Flowchart
Start
Prepare for installation
Site
Connect the cables and
install the back cover
Install the device
Finish
Install the mounting plate
assembly on the wall
Install the mounting plate
assembly on the pole
(horizontal or vertical)
Wall Pole
3.2 Before You Begin
Carefully plan and arrange the installation position, networking mode, power supply, and
cabling before installation. Confirm the following requirements before installation:
The installation site provides sufficient space for proper ventilation.
The installation site meets the temperature and humidity requirements of the AP.