EasyManua.ls Logo

Ruijie Reyee RG-RAP52-OD - Adding Network Devices

Ruijie Reyee RG-RAP52-OD
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hardware Installation and Reference Guide Debugging
21
4 Debugging
4.1 Setting up Configuration Environment
Use a 24 V non-standard PoE adapter or PoE power source to supply power to the device.
Before powering on the device using a 24 V non-standard PoE adapter or PoE power
source, verify that the power cord is properly connected, and that the configuration
environment meets the safety requirements.
Before performing debugging over a serial port connection, verify that both the PC and the
PoE switch are properly grounded.
4.2 Powering on the AP
4.2.1 Checklist Before Power-on
Verify that the access point has adequate earth ground.
Verify that the power cord is properly connected.
Verify that the input voltage meets with the requirement of the access point.
4.2.2 Checklist After Power-on
Verify that there is system log printed on the terminal interface.
Verify the LED status.

Other manuals for Ruijie Reyee RG-RAP52-OD

Related product manuals