Hardware Installation and Reference Guide Installing the Device
13
3 Installing the Device
3.1 Installation Procedure
Install the device according to the following procedure to prevent damage.
3.2 Preparing for Installation
Prepare for installation according to 2 Preparing for Installation and check whether the following conditions are
met:
The installation site provides sufficient space for heat dissipation.
The installation site meets the temperature and humidity requirements of the device.
The power supply is available at the installation site and its current meets the requirement.
Network cables have been deployed at the installation site.
The selected power supply meets the requirement on the system power.
The emergency power switch in the room is located so that the power supply can be cut off in the case of an
accident.