How to fix lost communication between master and slave on SAJ H2-6K-S3?
- CClinton OdonnellAug 25, 2025
To resolve a 'Lost Communication MS' error on your SAJ Inverter, verify the communication cables and connections.
How to fix lost communication between master and slave on SAJ H2-6K-S3?
To resolve a 'Lost Communication MS' error on your SAJ Inverter, verify the communication cables and connections.
Details critical safety precautions for handling the inverter and its components.
Presents detailed technical specifications for various H2 inverter models.
Details recommended installation locations and clearance requirements for optimal performance.
Explains the correct procedures for mounting the inverter securely on a wall.
Outlines the step-by-step process for physically installing the inverter.
Details the step-by-step process for physically installing the inverter.
Details how to connect the AC grid wire and backup output to the inverter.
Specifies requirements for external AC circuit breakers and RCDs.
Guides on connecting the PV array to the inverter, including safety warnings.
Guides on safely connecting the power cable to the battery system.
Details the procedure for connecting the battery to the inverter.
Illustrates system connection diagrams for grid-tied and off-grid configurations.
Provides a detailed schematic of the entire system connection.
Explains the procedures for starting and stopping the inverter and energy storage system.
Lists the steps required for system commissioning after wiring.