EasyManua.ls Logo

Samsung AJ024TXJ3CH - Page 92

Samsung AJ024TXJ3CH
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ťθʪ˙ʪθʪʀʪƊ˵ʪʪϩ
Samsung Electronics ߨࣗߤ
Ɵ˵ʪͱЇϩʒͱͱθЇϩϑͱɇʒʪʒиϩ˵ϑЇ˙ѣʀʪϩŵࣗߥߢߡθʪ˙θ˝ʪθɇϩࢋ
UͱͱϩЭʪϩŵࣗߤߣϩͱɇϩͱϑΧ˵ʪθʪࡠϩϑɇѤЇͱθɇϩʪʒ˝θʪʪ˵ͱЇϑʪ
˝ɇϑࡡʀͱЭʪθʪʒɵцçцͱϩͱťθͱϩͱʀͱࡡиϩ˵ɇͱɵɇǮɇθ˝ťͱϩʪϩɇ
Ǯť࣎ߣߡߩߩࢋ
ǽͱЇϑ˵ͱЇʒΧЇθ˝ʪϩ˵ʪɇθϩ˵ʪʒͱͱθЇϩɇʒϩ˵ʪΧΧʪࢋÃ˙ɇθ
θʪɇϑϩ˵ʪθʪ˙θ˝ʪθɇϩΧΧʪϑࡡϩɇ˙˙ʪʀϩϑϩ˵ʪʀͱΧθʪϑϑͱθࢋ
ÃϩɇцʀɇЇϑʪθʪʒЇʀϩͱͱ˙ʀͱͱ˝ʀɇΧɇʀϩцɇʒɇ˙Їʀϩͱࢋ
ŵʪ˙θ˝ʪθɇϩ˙ͱθɇθΧЇθ˝˝ϑͱϩʀ˵ɇθ˝ʪʒϩ˵ʪͱЇϩʒͱͱθЇϩ
ƸϑʪǤɇʀЇЇťЇΧɇϑϑʪʪϩ˵ʪΧʀϩЇθʪࢋ
1. Check the piping connections.
ߣࢋAͱʪʀϩϩ˵ʪʀ˵ɇθ˝˝˵ͱϑʪͱ˙ͱиΧθʪϑϑЇθʪϑʒʪͱ˙ɇ˙ͱʒ
gauge to the packed valve having a service port .
Make the electrical connection and leave the system into “stand
by mode”. Do not turn on the system! This is necessary for better
vacuum operation (full OPEN position of Electronic Expansion
Valve - EEV-).
CAUTION
Model Name
Valve
3/8” 1/2”
AJ020TXJ2CH 1 1
AJ024TXJ3CH 1 2
AJ020TXS3CH 3 -
AJ024TXS4CH
2
2
AJ030TXS4CH
AJ036TXS4CH
AJ036TXJ4CH
AJ048TXJ5CH 3
ߤࢋĮΧʪϩ˵ʪЭɇЭʪͱ˙ϩ˵ʪͱиΧθʪϑϑЇθʪϑʒʪͱ˙ɇ˙ͱʒ˝ɇЇ˝ʪʀͱЇ-
ter clockwise.
ߥࢋťЇθ˝ʪϩ˵ʪɇθ˙θͱϩ˵ʪϑцϑϩʪЇϑ˝ЭɇʀЇЇΧЇΧ˙ͱθɇɵͱЇϩߤߡ
minutes.
࡙Aͱϑʪϩ˵ʪЭɇЭʪͱ˙ϩ˵ʪͱиΧθʪϑϑЇθʪϑʒʪͱ˙ɇ˙ͱʒ˝ɇЇ˝ʪ
clockwise.
࡙đɇʪϑЇθʪϩ˵ɇϩΧθʪϑϑЇθʪ˝ɇЇ˝ʪϑ˵ͱиࣗߡࢋߢđťɇ࣍ࣗߨߧʀ²˝࣎ɇ˙ϩʪθ
about 1 hour. This procedure is very important in order to avoid
gas leak.
࡙ƟЇθͱ˙˙ϩ˵ʪЭɇʀЇЇΧЇΧࢋ
࡙ŵʪͱЭʪϩ˵ʪ˵ͱϑʪͱ˙ϩ˵ʪͱиΧθʪϑϑЇθʪϑʒʪͱ˙ɇ˙ͱʒ˝ɇЇ˝ʪࢋ
ߦࢋƊʪϩϑΧʒʪͱ˙ɵͱϩ˵αЇʒϑʒʪɇʒ˝ɇϑϑʒʪͱ˙ϑϩͱΧЭɇЭʪϩͱϩ˵ʪ
open position.
6. Mount the valve stem nuts and the service port cap to the valve,
ɇʒϩ˝˵ϩʪϩ˵ʪиϩ˵ɇϩͱθαЇʪиθʪʀ˵ࢋ
Outer diameter
(mm)
Tightening torque
Body cap
(N · m)
Charging port cap
(N · m)
ø 6.35 20 to 25
10 to 12
ø 9.52 20 to 25
ø 12.70 25 to 30
ø 15.88 30 to 35
ߨࣗߣAͱʪʀϩ˝ƸΧɇʒťЇθ˝˝ϩ˵ʪAθʀЇϩ
When installing, make sure there is no leakage. When recovering the refrigerant, ground the compressor first
before removing the connection pipe. If the refrigerant pipe is not properly connected and the compressor works
with the service valve open, the pipe inhales the air and it makes the pressure inside of the refrigerant cycle
abnormally high. It may cause explosion and injury.
WARNING
Vacuum
Pump
Tightening torque for body cap
(Refer to the table)
Charging core
Tightening torque for charging
port cap (Refer to the table)
R-140A : Diameter of the screw-1/2-20UNF
Spindle
Vacuum
Pump
INDOOR A UNIT
INDOOR B UNIT
Tightening torque for body cap
(Refer to the table)
Spindle
Charging
core
R-410A : Thread of the screw -1/2-2OUNF
Tightening torque for charging port cap (Refer to the table)

Table of Contents

Related product manuals